Advertisements

Residents of Diamond, South Windward now have a new concrete road.
The 466 feet long road was constructed by BRAGSA to replace an earthen/dirt road that was used to provide access to the Low Income houses.
In addition to the road, a 5 feet retaining wall was constructed and 466 feet of slipper drains.
The project was carried out at an estimated cost 199 thousand EC dollars.
It ran for 11 weeks.
Advertisements
