The Roads, Buildings and General Services Authority (BRAGSA) has completed the construction of a new concrete road on the grenadine island of Bequia.


    The 140 feet long road was constructed in Hamilton, along with a 38 feet long Box Culvert.
    The project also saw the construction of a 160 feet long retaining wall.
    It was carried out at a cost of $88,000.
    The work was done over a six weeks period.

    Share.

    Comments are closed.