The Roads, Buildings and General Services Authority (BRAGSA) has completed the construction of a new concrete road in Donaldson, Clifton – Union Island.

    The project saw the construction of 396 feet of road, along with Slipper and Kerb drains.

    In addition, BRAGSA built two retaining walls with a combined length of 504 feet.

    The project was carried out at a cost of $245,000.

    It was done over a ten weeks period.

    Share.

    Comments are closed.