The Roads, Buildings and General Services Authority (BRAGSA) has completed the construction of a new concrete road in Donaldson, Clifton – Union Island.

The project saw the construction of 396 feet of road, along with Slipper and Kerb drains.

In addition, BRAGSA built two retaining walls with a combined length of 504 feet.

The project was carried out at a cost of $245,000.

It was done over a ten weeks period.

Subscribe for News updates

Enter your email address to subscribe and receive notifications when new stories are posted.