BRAGSA has completed the reconstruction of a concrete roadway at Bajan Corner, Ashton Union Island.
The project saw the construction of a 54 feet road and a 420 feet Box Drain.
It was done at an estimated cost of 158–thousand EC dollars.
Meanwhile, work continues on the Ashton main road near the well.
The reconstruction of 652 feet of concrete road is being carried out.
It is being done at an estimated cost of 201- thousand EC dollars.
Work is scheduled to be completed by the end of September.