The Roads, Buildings and General Services Authority (BRAGSA) has completed the construction of a new concrete road in Langley Park, North Windward.

    The project saw the construction of 318 feet of road, along with Slipper drains.

    In addition, BRAGSA constructed a 108 feet long Swale drain.

    The project was carried out a cost of $98, 000.

    It was done over an eight weeks period.

    Share.

    Comments are closed.